ISO 9001:2015 · Govindpura Industrial Area, Bhopal WhatsApp
Dynamech Electropower Pvt. Ltd. logo
REQUEST A QUOTE
Engineer and farmer reviewing a solar water pumping installation in a field

PM-KUSUM
solar pumps & plants.

Solar water pumping systems for farmers, and transformers for PM-KUSUM solar plants — engineered and supported from Bhopal. Here is how the scheme works, what it pays for, and how we can help.

SCHEME STATUS · OCT 2026
Phase 1 projects continuingPM-KUSUM 2.0 announced in press, not yet launched
FINANCIAL CLOSURE · A & C
30 November 2026Extended by MNRE
PROJECT COMPLETION
31 March 2027MNRE: no extension beyond this
THREE COMPONENTS

One scheme. Three ways to put the sun to work.

PM-KUSUM is run by the Ministry of New and Renewable Energy (MNRE) and delivered in each state through its State Nodal Agency. Choose a component to see what it covers.

SUBSIDY ESTIMATOR · COMPONENTS B & C

See who pays what.

Enter the system cost and see the split between the central government, the state and the farmer — as set out in MNRE's PM-KUSUM guidelines.

Use the cost quoted by your State Nodal Agency or vendor. ₹1,00,000 is shown as an example.

STATE CATEGORY

Special category: North-Eastern states, Sikkim, J&K, Ladakh, Himachal Pradesh, Uttarakhand, Lakshadweep, Andaman & Nicobar.

SHARE OF COST
Central government (MNRE)30% of cost₹30,000
State government (minimum)At least 30% of cost₹30,000
Bank loan available to farmerUp to 30% of cost₹30,000
Farmer pays upfrontAbout 10% of cost₹10,000

Indicative only. Central assistance applies to the benchmark or tender cost, whichever is lower; state shares, loan terms and eligibility vary by state and tender. Confirm with your State Nodal Agency before applying.

HOW TO APPLY

From application to water in the field.

The exact process is set by each state. This is the typical path for a solar pump under Components B and C.

  1. Apply to your State Nodal Agency

    Register on the state portal or at the district office. In Madhya Pradesh this is MP Urja Vikas Nigam Ltd (MPUVNL).

  2. Approval & farmer share

    Once approved, pay the farmer share — about 10% upfront, with a bank loan available for up to 30%.

  3. Installation

    The empanelled vendor installs the pump, controller, panels and structure at your field.

  4. Inspection & handover

    The system is inspected and commissioned; the subsidy is settled as per scheme rules.

MADHYA PRADESH

MPUVNL is the State Nodal Agency. As reported in April 2026, around 27,100 solar pumps had been installed in the state under Component B, and the state aims to connect over 2 lakh farmers with solar pumps this financial year.

KEEP READY

Aadhaar, land records (khasra / khatauni), bank passbook, a recent photograph and mobile number — plus your water source (borewell or open well) and the pump size you need. Your state portal lists the exact documents.

Dynamech solar pump and motor system: controllers, pump-motor set, solar panel and structure stand
SOLAR PUMP & MOTOR SOLUTIONS
WHY DYNAMECH

Pumps from people who build the grid.

Since 1992 we have built transformers for Madhya Pradesh's distribution companies. That same engineering team now supplies complete solar pumping systems — and the transformers PM-KUSUM solar plants connect through.

  • Complete system from one supplier — panel to pump
  • Bhopal-based team for site visits, service and spares in Central India
  • ISO 9001:2015 quality system; transformers to IS 1180 and IS 2026
  • Toll-free support: 1800-2740-282
PM-KUSUM FAQ

Farmers ask us.

Scheme details on this page follow MNRE's PM-KUSUM guidelines and news reports up to October 2026. Timelines change — always confirm on the official portal pmkusum.mnre.gov.in and with your State Nodal Agency.
LAST REVIEWED: 16 OCT 2026

What is PM-KUSUM?

Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) is a Government of India scheme run by the Ministry of New and Renewable Energy (MNRE) that supports farmers to install solar pumps, solarise existing grid-connected pumps and set up small solar power plants.

How much subsidy can a farmer get for a solar pump?

Under Components B and C, the central government provides 30% of the benchmark or tender cost (whichever is lower), 50% in special category states, and the state government provides at least 30%. The farmer pays the balance — up to 40% in general states — of which up to 30% can be financed by a bank loan.

What size of solar pump is covered under Component B?

Component B supports stand-alone solar agriculture pumps of up to 7.5 HP in areas where grid supply is not available.

How do I apply for PM-KUSUM in Madhya Pradesh?

Applications are made through the State Nodal Agency. In Madhya Pradesh this is Madhya Pradesh Urja Vikas Nigam Ltd (MPUVNL). Check the MPUVNL website or your district office for the current application window and documents.

Is the PM-KUSUM scheme still open in 2026?

Phase 1 projects are continuing. As reported in October 2026, MNRE extended financial closure for Components A and C to 30 November 2026, with project completion by 31 March 2027. A successor scheme, PM-KUSUM 2.0, has been reported but not yet formally launched. Always confirm current timelines on pmkusum.mnre.gov.in.

What does Dynamech supply for PM-KUSUM projects?

Solar pump and motor systems — pump controllers, pump-motor sets, solar panels and structure stands — for Components B and C, and inverter duty and distribution transformers for Component A solar plants and feeder-level solarisation.

Ready to pump with the sun?

Tell us your water source and pump size — we'll advise the right system.

REQUEST A QUOTE CALL 1800-2740-282
REQUEST A QUOTE